Machining a prototype heater (2005)
|
Electric heater experiment (2005)
|
Extreme cold test on prototype valve (2007)
|
Constructing the first Easthampton office (2004)
|
Original Greasecar shop in Florence (2002)
|
Florence shop at capacity (2003)
|
First Easthampton office exceeding capacity (2005)
|
Construction of 2nd Easthampton office expansion (2006)
|
Tank and coil assembly shop (2005)
|
Assembled tanks awaiting shipment (2006)
|
Tank material being cut by lazer cutter (2005)
|
Justin inspecting a tank shell (2005)
|
Josiah assembling heat shrouds (2004)
|
Josh machining filter heads (2004)
|
Filter heads awaiting final touches (2004)
|
Josiah TIG welding a tank (2004)
|
Tank and filters ready to go (2004)
|
|
Close-up of a TIG weld (2003)
|
Josh in the machine shop (2004)
|
Greasecar tank being assembled (2003)
|